Traffic Conditions

Changed traffic conditions on Bruxner Highway at Tabulam Bridge

Motorists are advised of changed traffic conditions next week on the Bruxner Highway at Tabulam for maintenance work to be carried out on the Tabulam Bridge over the Clarence River.

Work to tighten bolts on the bridge decking will be carried out to reduce noise and provide a smoother ride for motorists.

Work will be carried out between 7am and 6pm from Monday 3 to Friday 7 August and will also include some full bridge closures of no longer than 10 minutes, outside of peak hours associated with school pick up and drop offs.

Normal traffic arrangements will operate outside of work hours and on weekends.

Traffic control and a reduced speed limit will be in place for the safety of workers and motorists.

Motorists are advised to drive to the conditions, and follow the directions of signs and traffic control.

Transport for NSW thanks motorists for their patience during this time.

For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.