Traffic Conditions

Changed traffic conditions on Summerland Way south of Casino

Motorists are advised of changed traffic conditions from this week on Summerland Way for road widening and rebuilding work to be carried out 28 kilometres south of Casino.

One lane will be closed with alternate traffic flow arrangements in place while wider road shoulders and centerlines are installed and the road resurfaced to provide a smoother and safer travelling surface for motorists.

Work will be carried out from 7am to 6pm on weekdays and from 8am to 1pm on Saturdays and is expected the work to be completed in two months, weather permitting.  

Traffic control and a reduced speed limit will be in place for the safety of workers and motorists.

Motorists are advised to drive to the conditions, and follow the directions of signs and traffic control. They should allow an additional five minutes travelling time.

Transport for NSW thanks motorists for their patience during this time.

For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.