Motorists are advised of changed traffic conditions and night work on the Pacific Highway from Monday 20 to Sunday 26 July for the Woolgoolga to Ballina upgrade, weather permitting.
From Monday, there will be four days of work next to the Pacific Highway at Broadwater remove a ramp. Motorists can expect traffic control and short stoppages at times between 7am and 5pm.
Also from Monday, there will be up to seven days of work between New Italy and Woodburn to carry out earthwork, paving, drainage work, landscaping, line marking and installing traffic safety barriers to allow vehicle access to site. Motorists can expect traffic control, reduced speed limits and short stoppages at times between 6am and 6pm.
There will be six nights and up to six days of work on the Pacific Highway between Devils Pulpit and Mororo from Monday to carry out line marking, asphalting and drainage work. Motorists can expect traffic control, lane closures and short stoppages at times while this work is carried out.
From Monday, there will be up to five days of work on the Pacific Highway between Maclean and Mororo to carry out road maintenance, survey work, landscaping, wire rope barrier repairs and asphalting. Motorists can expect lane closures and reduced speed limits between 6am and 6pm.
Also from Monday, there will be up to five days of work next to the Pacific Highway between Glenugie and Maclean to carry out line marking, survey work, asphalting, concrete paving, landscape maintenance and site access. Motorists can expect lane closures, traffic control and a reduced speed limit of 60 km/h between 7am and 6pm.
There will be up to five days of work on Big River Way at Glenugie and Tyndale to carry out line marking and landscape and drainage maintenance from Monday. Motorists can expect a lane closures, traffic control and a reduced speed limit of 40 km/h between 7am and 6pm.
From Tuesday, there will be four nights of work at New Italy to carry out earthwork, paving, line marking and installation of traffic safety barriers and drainage. Motorists can expect lane closures, traffic control and short stoppages at times between 6pm and 6am.
Additional changes to local roads
From Monday, there will be up to six days of work at the Iluka interchange, Iluka Road, Banana Road at Mororo and the Old Pacific Highway at Harwood to carry out earthwork, asphalting and allow access to site. Motorists can expect traffic control and short stoppages at times between 6am and 6pm.
Traffic control will be in place on Jubilee Street, Townsend and Cameron Street, Maclean for up to five days from Monday to allow access to site and to carry out earthwork, line marking and electrical work. Motorists can expect lane closures, a reduced speed limit of 40 km/h and short stoppages at times between 6am and 6pm.
From Monday, there will be up to six days of work on Minyumai Road at New Italy and Tuckombil Road at Woodburn to carry out earthwork, paving and safety barrier maintenance. Motorists can expect lanes closures, traffic control and short stoppages at times between 6am and 6pm.
Traffic control will be in place on Benson’s Lane at Tyndale to allow heavy vehicles to access site from Monday. Motorists can expect short stoppages at times.
Motorists are advised to drive to the conditions and follow the direction of signs and traffic control. Transport for NSW thanks road users for their patience during this time.
For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.